Hydro power project
Tsankov kamak
 
 
 
 
The project is of national im-portance financed by con-sortium of Austrian banks. It is the first pilot project under the joint implementation scheme to the Kyoto Protocol based on a Memorandum of Under-standing between the Republic of Bulgaria and the Republic of Austria. The project aims the development in the middle sec-tion of the Vacha Cascade and adequate utilization of the available hydro power potential along the river valley Vacha.
 
MINSTROY carries out design and construction, delivery and mounting of equipment, manufacture of non-standard metal structures and installations, both as independent activities or as complete engineering "key-in-hand" projects in mining, engineering infrastructure and main pipeline installations.
 
Semiramida Garden
Varna
 
 
The building consists of 95 luxury apartments with area from
37 sq.m to 185 sq.m
 
 
Semiramida Garden
Borovets
 
 
The complex consists of 5 stars hotel with three residential buildings, connected with low two storey buildings.