Opencast mining
|
Activities in opencast mining
MINSTROY realizes strip-minig projects for the production of minerals and building materials,
including:
-
excavation of boxcuts, trenches and benches and construction of road, railway
and conveyor network;
-
preliminary activities, assuring opencast mining, such as: hydroengineering systems
- canals, siphons, river-bed corrections, reservoirs;
-
mounting of bucket wheel excavators, bucket chain excavators and spreaders without
limitation on their weight and capacity;
-
installation of belt conveyor transportation systems (mobile or stationary) without
limitation of their length and width;
-
building and installation of al necessary serice facilities for the opencast
mining;
-
liquidation of opencast mines and rehabilitation of the worked-out area
-
all necessary maintenace, service and repairs facilities, connected with the
opencast mining
Bulgaria
Maritsa - Iztok lignite coal mining basin
Assermbling and putting into operation mining machines and equipment |
1. Bucket wheel excavators |
SRs4000 + VR |
1 pc |
SRs2000 28/3.0 (2õ500 êW) + VR |
9 pcs |
SRs2000 28/3.0 (2õ500 êW) |
4 pcs |
SRs1301 26/5.0 (500 êW) |
1 pc |
2. Chain multi-bucket excavators |
ÅRs 710 17,5/13,0-16,0 |
6 pcs |
ÅRs 560 16/12,0-15,0 |
1 pc |
3. Spreaders |
À2Rs-Â 6300.95 + ÂRs |
8 pcs |
À2Rs-Â 12500.100 + ÂRs |
2 pcs |
4. Reloaders |
À2Rs-Â 12500.100 |
|
5. Conveyors |
ÂRs 1400 37/50 |
3 pcs |
ÂRs 1600 42/72 |
1 pc |
ÂRs 1800.60 |
1 pc |
ÂRs 1400 |
1 pc |
6. Belt conveyors |
 1800 ìì 3 õ 560 êW |
over 80 pcs |
 2250 ìì 4 õ 1000 êW |
18 pcs |
belt width  1800 ìì |
over 90 km |
belt width  2250 ìì |
18 km |
Repairs and rehabilitation of machines and equipment for coal mining |
Rehabilitation of the electrical part of rotation excavator SRs 2000 |
1 pc |
Rehabilitation of the mechanical part of rotation excavator SRs 2000 |
1 pc |
Design, supply and mounting of the excavation part of rotor excavator
SRs 2000 |
1 pc |
General repairs of GTL 2 250 |
1 pc |
General repairs of spreader As 12 500 |
1 pc |
Rehabilitation of the electrical part of excavator ERs 710 |
1 pc |
Other activities as drainage canals, water catchments, dams, hydro-engineering
installations, pipelines, pump stations, buildings, roads and accompanying communication
network were executed.
Ash pile "Kamenik" of Bobov Dol Thermoelectric Power Plant
Assemblage of unique belt-conveyor for ash transportation with the following
characteristics: length of 5 000 m, width of 1400 mm, two horizontal curves, tilt
up to 12°, original belt-tipping device, automatic belt tensioning.
Mines
Kous, Zlaten Dol and Viatovo with capacity of 980 000 tons of caolin per year.
Quarries
Chernevo, Delyan and kozyaka for dolomites.
Macedonia
Suvodol mine, Bitolya – excavation of boxcuts and overburden removal.
Rzhanovo Fenimac mine – stripping operations, reaching up to 1 500 000 m3 annualy
for the production of 800 000 tons annualy of iron-nickel ore. |