|  | 
		| 
				
					|  | 
| Photos             | Rosenetz Residence   
| Investor | Personal Engineering EOOD |  
| Contractor | Minstroy Holding AD |  
| Period | August 2004 - July 2005 |  
| Budget | 3 600 000 BGN |  
| Description | 
Rosentez residence is situated in a park south from Bourgas. The reach flora 
and the fact that it is situated on the very shore of the sea makes the residence 
exclusively attractive and unique. The total built up area of teh residence is 
2400 sq.m. The three storey building has 11 apartments. There is a mini SPA center 
in the ground floor. The interior is luxyry designed with classical solid furniture. 
The outer area has nice alleys, decorative stones and greenery. There is an outdoors 
swimming pool in front of the residence.
 In 2006 started the formation of Rosentetz park that is situated between the 
residence and the sea shore. The project includes the construction of barbeque 
spot, slope greenery, water alleys and purification station.
 In this complex, Minstroy Holding AD realizes its abilities as builder and creator, 
making the park and the residence an ornament among the other large scaled projects. |  
| Technical data | 
The building is reconstructed keeping scaffolding construction without trimmer 
joists. The outer brick walls are insulated. |        |  |  | 
	
		|  |